The internet home for Hoos anywhere and everywhere.

Virginia Baseball Board

Bourbon Bowl

Joined: 1/24/02 Posts: 7702
Likes: 1898


Yeah at this point, doing the 3B side before the season would be a really


aggressive timeline. Seems a much less involved operation to build some stands into the existing hillside than building from the ground up on the 1B line. If the LF bullpen is coming, they better get on their horse. Which makes the current 3B bullpen a big 'ole waste of space until that side is completed.

Very interesting though that all of the promotional material includes the changes on the 3B/LF side. The update BOC did in late Nov/early Dec said everything was on schedule.

(In response to this post by Wahoosyourdaddy)

Posted: 01/11/2018 at 09:42AM



+0

Insert a Link

Enter the title of the link here:


Enter the full web address of the link here -- include the "http://" part:


Current Thread:
 
  
Stadium update -- Wahoosyourdaddy 01/10/2018 7:02PM
  Here's some clarification -- UVA001 01/11/2018 12:37PM
  What are the plans for the left field bleachers? -- HOOfan_1 01/11/2018 08:17AM
  Wasn't this supposed to be 2 phases? -- TJUCavs 01/10/2018 7:43PM

Get the Sabre Edge!

Subscribe to TheSabre.com!

Support Us by Shopping at Amazon

vm312